Bank of England structural VAR
BoE SVAR
The data, estimation, identification, sampling and the unemployment satellite.
Eight variables, six named shocks
From raw quarterly data to named structural shocks, following Bank of England Macro Technical Paper No. 3 (Brignone & Piffer, 2025).
The data: eight quarterly variables
Eight quarterly series in two blocks, global and UK.
The eight variablesSample and specification · Conditioning versus estimation
Sample and specification
Estimation covers the inflation-targeting era, 1992Q1–2025Q1, in both the paper replication and the hosted adapter — in levels, with
Conditioning versus estimation
The hosted forecast conditions on observations through 2026Q2 without re-estimating coefficients on them.
Bayesian estimation
Bayesian, with a Minnesota prior in the framework of Giannone, Lenza & Primiceri (2015).
PriorsThe posterior
The posterior
The output is a posterior over the reduced-form coefficients
Identification: naming the shocks
Identification follows Arias–Rubio-Ramírez–Waggoner (2018); sign restrictions name six structural shocks: world demand, world energy, world supply, UK demand, UK supply, and UK monetary policy.
Restrictions and correctionsZero and sign restrictions · importance weights · permutation search
Sampling: draws and acceptance
Accept/reject sampling on posterior
Accept/reject samplingProduction run · hosted default · forecast runs
Few draws pass the sign restrictions, so medians and bands are noisier than the paper's. The production run uses data through 2026Q2 and seed 20260812 (results/summary.md, after boe-var-model #24).
Hosted and forecast runs
- The hosted forecast conditions on data through 2026Q2 and keeps the 2025Q1 coefficient-estimation endpoint.
- Its default 2,000-draw run (159 accepted, ESS 48.7) is below the ESS of 100 at which the response warns of weak inference.
- The current-outlook chart on the overview is the archived 12 Nov 2026 round: a separate forecast run, 455 of 6,000 accepted (ESS 181.4), not the production run above.
- Forecast runs leave the dummy-initial-observation prior off, which moves medians by 0.02pp or less.
The svar-unemployment satellite
Unemployment is not one of the eight VAR variables. A separate satellite maps the VAR's UK GDP growth forecast into a path for the ONS unemployment rate (MGSX), leaving the replication core untouched.
The regressionHow it is fitted · how the bands work · how far it is validated
How it is fitted
- OLS of the quarterly change in unemployment on year-on-year GDP growth and its own lag, over the VAR's 1992Q1–2025Q1 sample.
- The furlough quarters (2020Q1–2021Q2) are dummied out: GDP fell about 20% on a year earlier while unemployment barely moved.
- Including them cuts the growth coefficient about threefold (β −0.047 → −0.016).
How the bands work
- Archived 28 Jul 2026 round: unemployment falls as GDP growth rises, so the GDP median and bands pass through with the bounds swapped. These bands carry GDP-forecast uncertainty only, so they are too narrow.
- The model now (boe-var-model #32): simulates along every GDP path with residual and coefficient draws, adding the satellite's own residual and estimation uncertainty. No round with these bands is archived yet.
- Measured coverage of both: validation tab.
How far it is validated
- The published path is capped at four quarters, the range that was tested.
- 73-origin rolling test (origins 2005Q1 to 2023Q1): excluding the Covid quarters the satellite beats no-change at horizons 1–4, not significantly; on all 73 targets it is level at h=1 and worse from h=2.
Notation 7 symbols
| Symbol | Meaning | Step |
|---|---|---|
| vector of the eight VAR variables in quarter t | 2 | |
| constant and lag-coefficient matrices | 2 | |
| number of lags | 2 | |
| reduced-form errors and their covariance | 2 | |
| quarterly change in the unemployment rate (satellite) | 5 | |
| year-on-year UK GDP growth (satellite) | 5 | |
| satellite regression coefficients and residual | 5 |
Sources
The paper, the method papers and the code.
| what | where |
|---|---|
| The source paper | Macro Technical Paper No. 3 — Brignone & Piffer, Bank of England, July 2025. |
| Companion paper | Brignone & Piffer, structural forecast analysis — the Section 5 forecast-revision method, later BoE Staff Working Paper No. 1,165 (January 2026). |
| Our working paper | papers/boe-svar — the full replication write-up, quarterly forecast scorecard, and enumerated deviations. |
| This replication | github.com/PolicyEngine/boe-var-model — code, prepared data, figures, and the annotated RESOURCES.md. |
| Method papers | Arias, Rubio-Ramírez & Waggoner (2018) — zero/sign identification · Chan, Matthes & Yu (2025) — permutation-search speedup · Giannone, Lenza & Primiceri (2015) — the prior framework. |
| Reference toolboxes | bsvarSIGNs (R, the exact Arias et al. machinery) · ECB BEAR · Cesa-Bianchi VAR-Toolbox — used in the independent econometrics review, which caught and fixed a genuine bias in the zero-restriction importance weights. |